How we work
Managed process through handover.
Every project is guided by planning, safety, and clear documentation.
01
Survey & measurement
Site measurement, risk assessment, and verification of existing facade conditions.
02
Planning & shop drawings
Technical planning, shop drawings, material take-off, and method statements.
03
Procurement & fabrication
Verified material procurement and component fabrication to specification.
04
K3-led installation
Installation by licensed teams and operators — gondolas, hoists, height access.
05
Handover & maintenance
Documented handover, work warranty, and scheduled maintenance programmes.
Safety is non-negotiable.
- K3 licences for lifting equipment (gondola) — Indonesian Ministry of Manpower
- Daily toolbox meetings & work permits
- Full PPE & periodic equipment inspection
- Solid coordination across subcontractors
- Audit documentation & project reporting
QHSE
K3 · Toolbox · Licensed gondola · Documented handover
Ready to discuss the next project?
From facade installation to emergency glass replacement — TSI is ready to support your asset.