Skip

How we work

Managed process through handover.

Every project is guided by planning, safety, and clear documentation.

01

Survey & measurement

Site measurement, risk assessment, and verification of existing facade conditions.

02

Planning & shop drawings

Technical planning, shop drawings, material take-off, and method statements.

03

Procurement & fabrication

Verified material procurement and component fabrication to specification.

04

K3-led installation

Installation by licensed teams and operators — gondolas, hoists, height access.

05

Handover & maintenance

Documented handover, work warranty, and scheduled maintenance programmes.

Safety is non-negotiable.

  • K3 licences for lifting equipment (gondola) — Indonesian Ministry of Manpower
  • Daily toolbox meetings & work permits
  • Full PPE & periodic equipment inspection
  • Solid coordination across subcontractors
  • Audit documentation & project reporting

QHSE

K3 · Toolbox · Licensed gondola · Documented handover

Ready to discuss the next project?

From facade installation to emergency glass replacement — TSI is ready to support your asset.